Murals
A canvas of stickies, shapes, and images.
Facilitated workshops on a shared digital wall
4.2 Editor score Editor score 4.2 out of 5. This is an editorial opinion, not a user rating.
Last updated November 15, 2026. Editor scores are our opinion, not user ratings. Prices were read from vendor sites in November 2026 and can change. Some listings may be sponsored. Sponsorship never changes our editor scores. Disclosure
Mural is a digital whiteboard aimed at facilitated workshops: sticky notes, voting, timers, and templates for retrospectives and design sprints. It runs in the browser. A free plan is published. We did not confirm a current dollar entry price, a founding year, or a single headquarters line we were willing to print, so those fields stay empty.
Mural is aimed at small business, mid-market, enterprise teams and runs on Web. Facilitators pick it when the session needs structure — a timer, a voting round, a locked area — more than an endless diagramming surface. It overlaps Miro and FigJam and does not replace a task manager.
We did not publish a starting price for Mural. The pricing page either asks for a quote or did not show a stable number in our November 2026 check, so the profile says “Not listed” instead of guessing.
Without a confirmed price, do not budget from this page. Deployment here is listed as web only. Check whether your facilitators need a desktop install before you standardize.
The editor score is an opinion across features, ease of use, pricing and value, support, and integrations. It is not a user-rating average. Mural has no customer reviews on this directory yet. Corrections go through the contact page.
A canvas of stickies, shapes, and images.
Timers, voting, and private mode support a live session.
Method libraries for common workshops.
Some flows help turn a wall of notes into a written summary.
Visitors can join a session; confirm the current guest rules.
Connections exist for chat and video tools used during the workshop.
Figures below are the vendor’s published list prices when we could confirm them. “See vendor site” means we did not publish a number.
Free
See vendor site
confirm the current packages
We do not publish interface images we have not captured ourselves. This gallery stays empty until an editor adds them.
Miro is the usual comparison when you want more diagramming and a published starter price. FigJam is the comparison when the team already draws in Figma. A video tool hosts the call; it does not hold the stickies. The profiles linked below are the ones we list, scored the same way, with unpublished prices left blank.
An infinite whiteboard for workshops and diagrams
4.4 Editor score Editor score 4.4 out of 5. This is an editorial opinion, not a user rating.
A whiteboard that lives next to Figma designs
4.3 Editor score Editor score 4.3 out of 5. This is an editorial opinion, not a user rating.
Docs, wikis, and databases in one workspace
4.6 Editor score Editor score 4.6 out of 5. This is an editorial opinion, not a user rating.
Video meetings with a free plan and a clear paid step-up
4.5 Editor score Editor score 4.5 out of 5. This is an editorial opinion, not a user rating.
No reviews yet — be the first.
We do not publish user reviews until a real submission system is open. Editor score above is not an average of customer ratings.