Menu
Categories Document Collaboration Online Whiteboard Project Management Task Management Team Communication Video Conferencing Compare Guides Blog Get Listed List your tool Contact
Search

FigJam

A whiteboard that lives next to Figma designs

4.3 Editor score Editor score 4.3 out of 5. This is an editorial opinion, not a user rating.

Features · 30% 4.2
Ease of use · 20% 4.8
Pricing and value · 20% 4.5
Support · 15% 3.9
Integrations · 15% 4.1

How this score is built

Last updated November 15, 2026. Editor scores are our opinion, not user ratings. Prices were read from vendor sites in November 2026 and can change. Some listings may be sponsored. Sponsorship never changes our editor scores. Disclosure

Overview

FigJam is Figma’s online whiteboard. Figma is based in San Francisco. The board is meant for designers and the partners who review their work: stickies, stamps, diagrams, and a cursor you can see. A starter plan is free. We are not publishing a Professional dollar price because FigJam is sold beside Figma design seats and the number should be read on Figma’s own pricing page.

FigJam is aimed at freelancers, small business, mid-market teams and runs on Web, Windows, Mac. It shines when the next step after the workshop is a Figma file. People who do not use Figma still can open a board, but they are not the center of the product. Desktop apps exist for Windows and Mac as well as the browser.

We did not publish a starting price for FigJam. The pricing page either asks for a quote or did not show a stable number in our November 2026 check, so the profile says “Not listed” instead of guessing.

Founding year is blank because FigJam is a product inside Figma, not a separate company. Do not treat a design-seat price as the FigJam price without reading the current table.

The editor score is an opinion across features, ease of use, pricing and value, support, and integrations. It is not a user-rating average. FigJam has no customer reviews on this directory yet. Corrections go through the contact page.

Key features

Shared cursors

People see each other on the board during a live session.

Stickies and stamps

Lightweight reactions suit a critique or a retro.

Open in Figma

A board can sit in the same account as design files.

Templates

Icebreakers and mapping layouts ship with the product.

Audio

A jam can include voice without a separate meeting link.

Free starter

You can try FigJam without a paid Figma design seat.

Pricing

Figures below are the vendor’s published list prices when we could confirm them. “See vendor site” means we did not publish a number.

Starter

Free

FigJam starter limits apply

  • Whiteboard in a Figma account

Professional

See vendor site

confirm on Figma pricing

  • Higher limits and team controls

Pros and cons

Pros

  • Calm interface
  • Free starter plan
  • Best when Figma is already the design tool
  • Desktop apps for Windows and Mac

Cons

  • Paid price not separated here from Figma’s table
  • Less workshop machinery than a facilitation-first board
  • A odd fit if nobody on the team uses Figma

Integrations

  • Figma
  • Slack
  • Jira
  • Asana
  • Google Drive

Screenshots

No screenshots yet

We do not publish interface images we have not captured ourselves. This gallery stays empty until an editor adds them.

Top alternatives

Choose another board if the session is a large facilitated workshop rather than a design conversation, or if the outcome should be a written document. Miro and Mural are the board comparisons. Docs tools are what you open after the stickies are sorted. The profiles linked below are the ones we list, scored the same way, with unpublished prices left blank.

See all FigJam alternatives

Reviews

No reviews yet — be the first.

We do not publish user reviews until a real submission system is open. Editor score above is not an average of customer ratings.