Infinite canvas
Frames, stickies, and drawings on one board.
An infinite whiteboard for workshops and diagrams
4.4 Editor score Editor score 4.4 out of 5. This is an editorial opinion, not a user rating.
Last updated November 15, 2026. Editor scores are our opinion, not user ratings. Prices were read from vendor sites in November 2026 and can change. Some listings may be sponsored. Sponsorship never changes our editor scores. Disclosure
Miro is an online whiteboard with an infinite canvas, sticky notes, diagrams, and workshop templates. The company was founded in 2011 and is based in Amsterdam. The free plan includes three editable boards. Starter is listed at $8 per member per month when billed yearly, and Business at $20. Enterprise is quoted and starts, on the pricing page, from 30 members.
Miro is aimed at small business, mid-market, enterprise teams and runs on Web, Windows, Mac, iOS, Android. Facilitators use it for retros, journey maps, and design critiques. It is a board, not a task system, though cards can link out to one. Desktop and mobile apps exist alongside the browser.
The paid entry price we could confirm for Miro is $8 per member each month on Starter, billed yearly. That is a list price from the vendor site in November 2026, not a negotiated discount, and it can change.
Three free boards disappear quickly in a real workshop practice. Per-member pricing adds up if a whole company is invited as editors rather than guests. Confirm guest rules on the current page.
The editor score is an opinion across features, ease of use, pricing and value, support, and integrations. It is not a user-rating average. Miro has no customer reviews on this directory yet. Corrections go through the contact page.
Frames, stickies, and drawings on one board.
Workshops start from a prepared layout.
The free plan’s editable-board cap is the main limit.
Starter adds privacy beyond the free set.
Flowcharts and maps sit beside freeform notes.
Async walkthroughs reduce the need for a live call.
Figures below are the vendor’s published list prices when we could confirm them. “See vendor site” means we did not publish a number.
$0
3 editable boards
$8
per member / month, billed yearly
$20
per member / month, billed yearly
Custom
from 30 members
We do not publish interface images we have not captured ourselves. This gallery stays empty until an editor adds them.
Teams try another board when they want a tighter free plan, when designers already pay for Figma, or when the workshop needs to collapse into a written document afterward. Miro is rarely replaced by a task tool alone. The profiles linked below are the ones we list, scored the same way, with unpublished prices left blank.
Facilitated workshops on a shared digital wall
4.2 Editor score Editor score 4.2 out of 5. This is an editorial opinion, not a user rating.
A whiteboard that lives next to Figma designs
4.3 Editor score Editor score 4.3 out of 5. This is an editorial opinion, not a user rating.
Docs, wikis, and databases in one workspace
4.6 Editor score Editor score 4.6 out of 5. This is an editorial opinion, not a user rating.
Chat and meetings inside the Microsoft 365 workplace
4.4 Editor score Editor score 4.4 out of 5. This is an editorial opinion, not a user rating.
No reviews yet — be the first.
We do not publish user reviews until a real submission system is open. Editor score above is not an average of customer ratings.