Meetings
Scheduled and instant meetings from a personal link.
Video meetings with a free plan and a clear paid step-up
4.5 Editor score Editor score 4.5 out of 5. This is an editorial opinion, not a user rating.
Last updated November 15, 2026. Editor scores are our opinion, not user ratings. Prices were read from vendor sites in November 2026 and can change. Some listings may be sponsored. Sponsorship never changes our editor scores. Disclosure
Zoom is a video meeting product from a company founded in 2011 and based in San Jose. Workplace Basic is free and, on the pricing page we checked, limits group meetings to 40 minutes and 100 participants. Workplace Pro is listed at $16 per user per month when billed annually. The client is available on the web and as desktop and mobile apps.
Zoom is aimed at freelancers, small business, mid-market, enterprise teams and runs on Web, Windows, Mac, iOS, Android. People know how to join a Zoom link, which is a large part of the product’s value. Webinars, rooms, and phone are separate add-ons or higher plans. Chat exists, but most buyers are here for the meeting itself.
The paid entry price we could confirm for Zoom is $16 per user each month on Workplace Pro, billed annually. That is a list price from the vendor site in November 2026, not a negotiated discount, and it can change.
The 40-minute group cap on the free plan is the reason small businesses pay. Business-tier pricing was not copied into this profile. Confirm add-on prices for webinars if that is the real requirement.
The editor score is an opinion across features, ease of use, pricing and value, support, and integrations. It is not a user-rating average. Zoom has no customer reviews on this directory yet. Corrections go through the contact page.
Scheduled and instant meetings from a personal link.
Basic group meetings are listed at 40 minutes.
Pro keeps the 100-participant meeting size of the free plan while lifting the clock.
Local or cloud recording depends on the plan; check the current matrix.
A chat sidebar ships with Workplace, secondary to meetings.
Calendar connectors and meeting-room hardware are part of the broader product.
Figures below are the vendor’s published list prices when we could confirm them. “See vendor site” means we did not publish a number.
Free
40-minute group meetings, up to 100 participants
$16
per user / month, billed annually
See vendor site
higher participant counts
Custom
contact sales
We do not publish interface images we have not captured ourselves. This gallery stays empty until an editor adds them.
Alternatives come up when the company already has Meet or Teams and does not want another meeting license, or when the 40-minute cap and per-host pricing feel clumsy. A chat tool is only a partial substitute. The profiles linked below are the ones we list, scored the same way, with unpublished prices left blank.
Browser meetings attached to a Google account
4.4 Editor score Editor score 4.4 out of 5. This is an editorial opinion, not a user rating.
Cisco meetings for companies that already buy Cisco
4.1 Editor score Editor score 4.1 out of 5. This is an editorial opinion, not a user rating.
Chat and meetings inside the Microsoft 365 workplace
4.4 Editor score Editor score 4.4 out of 5. This is an editorial opinion, not a user rating.
Channels for the conversations a team needs to keep
4.7 Editor score Editor score 4.7 out of 5. This is an editorial opinion, not a user rating.
No reviews yet — be the first.
We do not publish user reviews until a real submission system is open. Editor score above is not an average of customer ratings.