Channels
Topic rooms replace long email threads.
Channels for the conversations a team needs to keep
4.7 Editor score Editor score 4.7 out of 5. This is an editorial opinion, not a user rating.
Last updated November 15, 2026. Editor scores are our opinion, not user ratings. Prices were read from vendor sites in November 2026 and can change. Some listings may be sponsored. Sponsorship never changes our editor scores. Disclosure
Slack is a channel-based chat product for companies that want work conversations out of personal inboxes. It was founded in 2013 and is based in San Francisco, now inside Salesforce. The free plan keeps message and file history for 90 days and limits integrations. Pro is listed at $7.25 per user per month when billed annually, or $8.75 month to month.
Slack is aimed at small business, mid-market, enterprise teams and runs on Web, Windows, Mac, iOS, Android. A channel can follow a team, a project, or an incident. Threads, huddles, and a very large app directory are why it became a default. It is chat first. Meetings and documents happen in other tools that connect to it.
The paid entry price we could confirm for Slack is $7.25 per user each month on Pro, billed annually. That is a list price from the vendor site in November 2026, not a negotiated discount, and it can change.
The 90-day history on the free plan is the practical cliff. Search is only as useful as the history you keep. It is also easy to create more channels than anyone can read.
The editor score is an opinion across features, ease of use, pricing and value, support, and integrations. It is not a user-rating average. Slack has no customer reviews on this directory yet. Corrections go through the contact page.
Topic rooms replace long email threads.
A side conversation stays attached to the original message.
Paid plans keep history so search still works months later.
A lightweight call can start inside a channel.
The directory connects the chat surface to other software.
Business+ adds stronger sign-in and compliance controls.
Figures below are the vendor’s published list prices when we could confirm them. “See vendor site” means we did not publish a number.
$0
90-day message and file history
$7.25
per user / month, billed annually ($8.75 month-to-month)
$15
per user / month, billed annually ($18 month-to-month)
Custom
contact sales
We do not publish interface images we have not captured ourselves. This gallery stays empty until an editor adds them.
Companies look at other chat tools when they already pay for Microsoft 365 or Google Workspace and do not want a second conversation bill. Others leave because they wanted meetings, files, and chat in one suite rather than a best-of-breed channel product. The profiles linked below are the ones we list, scored the same way, with unpublished prices left blank.
Chat and meetings inside the Microsoft 365 workplace
4.4 Editor score Editor score 4.4 out of 5. This is an editorial opinion, not a user rating.
Rooms and direct messages for Google Workspace teams
4.2 Editor score Editor score 4.2 out of 5. This is an editorial opinion, not a user rating.
Video meetings with a free plan and a clear paid step-up
4.5 Editor score Editor score 4.5 out of 5. This is an editorial opinion, not a user rating.
Docs, wikis, and databases in one workspace
4.6 Editor score Editor score 4.6 out of 5. This is an editorial opinion, not a user rating.
No reviews yet — be the first.
We do not publish user reviews until a real submission system is open. Editor score above is not an average of customer ratings.