Browser meetings
Join from Chrome or another browser without a required desktop install.
Browser meetings attached to a Google account
4.4 Editor score Editor score 4.4 out of 5. This is an editorial opinion, not a user rating.
Last updated November 15, 2026. Editor scores are our opinion, not user ratings. Prices were read from vendor sites in November 2026 and can change. Some listings may be sponsored. Sponsorship never changes our editor scores. Disclosure
Google Meet is the meeting product attached to a Google account, from the company based in Mountain View. You can start a call in the browser without installing a desktop app. Personal use is free. Larger administration and the meeting limits that matter to a company come with Google Workspace, and this profile does not invent a Workspace price or a minute cap for the free plan.
Google Meet is aimed at freelancers, small business, mid-market, enterprise teams and runs on Web, iOS, Android. If the team already lives in Calendar and Gmail, Meet is the path of least resistance. Guests can join from a link. It is a weaker choice if you need webinars, a huge app marketplace, or a meeting product your IT team already standardized outside Google.
Google Meet can be used at no charge on the plan described below. Where a paid bundle exists, this profile only names a dollar amount the vendor page actually stated.
We are not stating a free-meeting time limit because that number has changed before and was not re-read as a single stable figure for this page. Check Google’s current help page before you promise clients an open-ended call.
The editor score is an opinion across features, ease of use, pricing and value, support, and integrations. It is not a user-rating average. Google Meet has no customer reviews on this directory yet. Corrections go through the contact page.
Join from Chrome or another browser without a required desktop install.
Meet links are created from Google Calendar events.
A free Google account is enough to host everyday calls.
Companies buy Meet as part of Workspace, not as a lone seat in this listing.
iOS and Android apps exist for people away from a desk.
The same account also reaches Google Chat and Drive.
Figures below are the vendor’s published list prices when we could confirm them. “See vendor site” means we did not publish a number.
Free
included with a Google account
See vendor site
suite edition, price not listed here
We do not publish interface images we have not captured ourselves. This gallery stays empty until an editor adds them.
People compare Zoom when they want a published meeting product with its own admin and a known free-plan clock. Teams is the comparison inside Microsoft 365. Meet stays attractive when the rest of the day is already in Google. The profiles linked below are the ones we list, scored the same way, with unpublished prices left blank.
Video meetings with a free plan and a clear paid step-up
4.5 Editor score Editor score 4.5 out of 5. This is an editorial opinion, not a user rating.
Cisco meetings for companies that already buy Cisco
4.1 Editor score Editor score 4.1 out of 5. This is an editorial opinion, not a user rating.
Chat and meetings inside the Microsoft 365 workplace
4.4 Editor score Editor score 4.4 out of 5. This is an editorial opinion, not a user rating.
Channels for the conversations a team needs to keep
4.7 Editor score Editor score 4.7 out of 5. This is an editorial opinion, not a user rating.
No reviews yet — be the first.
We do not publish user reviews until a real submission system is open. Editor score above is not an average of customer ratings.