Spaces
Rooms group a team or a project.
Rooms and direct messages for Google Workspace teams
4.2 Editor score Editor score 4.2 out of 5. This is an editorial opinion, not a user rating.
Last updated November 15, 2026. Editor scores are our opinion, not user ratings. Prices were read from vendor sites in November 2026 and can change. Some listings may be sponsored. Sponsorship never changes our editor scores. Disclosure
Google Chat is the messaging piece of Google Workspace, from the company based in Mountain View. Spaces (rooms) and direct messages sit next to Gmail, Meet, and Drive. A personal Google account can use Chat at no charge. Business administration, retention, and shared drives come with Workspace, and this profile does not repeat a Workspace dollar price because we are not listing a suite figure we did not re-check as a Chat-only price.
Google Chat is aimed at small business, mid-market, enterprise teams and runs on Web, iOS, Android. It is the low-friction choice when the company already shares Docs and Meet. You do not buy a separate chat seat. The trade is a smaller app ecosystem and fewer specialized admin features than a chat product sold on its own.
Google Chat can be used at no charge on the plan described below. Where a paid bundle exists, this profile only names a dollar amount the vendor page actually stated.
If your workflows depend on a huge directory of chat apps, Chat will feel thin. Founding year is left blank because Chat evolved inside Google rather than launching as a standalone company.
The editor score is an opinion across features, ease of use, pricing and value, support, and integrations. It is not a user-rating average. Google Chat has no customer reviews on this directory yet. Corrections go through the contact page.
Rooms group a team or a project.
One-to-one and small group chat.
Calls and files from the same account open without a second login.
Conversations can stay grouped in a space.
Retention and identity follow the Workspace edition you buy.
A free Google account is enough to try the client.
Figures below are the vendor’s published list prices when we could confirm them. “See vendor site” means we did not publish a number.
Free
See vendor site
suite price not listed here
We do not publish interface images we have not captured ourselves. This gallery stays empty until an editor adds them.
Buyers look elsewhere when they want a deep app directory, when Microsoft 365 is the company standard, or when chat must be the system of record rather than a side panel on Gmail. A docs tool is a different question; Chat will not hold your project plan. The profiles linked below are the ones we list, scored the same way, with unpublished prices left blank.
Channels for the conversations a team needs to keep
4.7 Editor score Editor score 4.7 out of 5. This is an editorial opinion, not a user rating.
Chat and meetings inside the Microsoft 365 workplace
4.4 Editor score Editor score 4.4 out of 5. This is an editorial opinion, not a user rating.
Browser meetings attached to a Google account
4.4 Editor score Editor score 4.4 out of 5. This is an editorial opinion, not a user rating.
Docs, wikis, and databases in one workspace
4.6 Editor score Editor score 4.6 out of 5. This is an editorial opinion, not a user rating.
No reviews yet — be the first.
We do not publish user reviews until a real submission system is open. Editor score above is not an average of customer ratings.