Menu
Categories Document Collaboration Online Whiteboard Project Management Task Management Team Communication Video Conferencing Compare Guides Blog Get Listed List your tool Contact
Search

Airtable

A spreadsheet-database for tracking real work

4.3 Editor score Editor score 4.3 out of 5. This is an editorial opinion, not a user rating.

Features · 30% 4.7
Ease of use · 20% 4.0
Pricing and value · 20% 4.0
Support · 15% 4.1
Integrations · 15% 4.6

How this score is built

Last updated November 15, 2026. Editor scores are our opinion, not user ratings. Prices were read from vendor sites in November 2026 and can change. Some listings may be sponsored. Sponsorship never changes our editor scores. Disclosure

Overview

Airtable is a relational spreadsheet you can turn into a small internal app. The company was founded in 2012 and is based in San Francisco. A base has tables, linked records, and views such as grid, kanban, and calendar. There is a free plan. Team and Business prices were not locked in this check, so no starting price is printed.

Airtable is aimed at small business, mid-market, enterprise teams and runs on Web, iOS, Android. Operations teams use it to track campaigns, inventories, or editorial calendars where a row has relationships to other rows. It is more database than document, and more flexible than a classic task list. Interfaces can present a simpler front end on top of the same tables.

We did not publish a starting price for Airtable. The pricing page either asks for a quote or did not show a stable number in our November 2026 check, so the profile says “Not listed” instead of guessing.

Free bases hit record and attachment limits; read the current caps before you migrate a large sheet. It is easy to build a base only one person understands. This is not the tool for a meeting or for long-form writing.

The editor score is an opinion across features, ease of use, pricing and value, support, and integrations. It is not a user-rating average. Airtable has no customer reviews on this directory yet. Corrections go through the contact page.

Key features

Linked records

A row in one table can point at rows in another.

Views

Grid, kanban, calendar, and gallery show the same data.

Interfaces

A cleaner page can hide the raw tables.

Forms

People outside the base can submit a row.

Automations

Paid plans expand how a change triggers an action.

Extensions

Scripts and marketplace extensions add behavior.

Pricing

Figures below are the vendor’s published list prices when we could confirm them. “See vendor site” means we did not publish a number.

Free

Free

  • Bases with free-plan record and attachment limits

Team

See vendor site

per seat

  • More records and extensions

Business

See vendor site

per seat

  • Admin and advanced interfaces

Enterprise

Custom

contact sales

  • Enterprise security

Pros and cons

Pros

  • Stronger than a spreadsheet when data is related
  • Free plan to model a base
  • Forms and interfaces reduce training
  • San Francisco company with a clear product category

Cons

  • Seat prices not listed here
  • Bases rot if nobody owns the schema
  • Not a document editor or a meeting tool

Integrations

  • Slack
  • Google Drive
  • Gmail
  • Jira
  • Salesforce
  • Zendesk
  • Stripe

Screenshots

No screenshots yet

We do not publish interface images we have not captured ourselves. This gallery stays empty until an editor adds them.

Top alternatives

Notion is the comparison when pages matter as much as tables. monday.com is the comparison when you want a more guided board. Google Docs is only a comparison if the job was writing, not tracking structured records. The profiles linked below are the ones we list, scored the same way, with unpublished prices left blank.

See all Airtable alternatives

Reviews

No reviews yet — be the first.

We do not publish user reviews until a real submission system is open. Editor score above is not an average of customer ratings.