Tasks and subtasks
Work breaks down several levels inside a list or folder.
Tasks, docs, and goals in one workspace
4.4 Editor score Editor score 4.4 out of 5. This is an editorial opinion, not a user rating.
Last updated November 15, 2026. Editor scores are our opinion, not user ratings. Prices were read from vendor sites in November 2026 and can change. Some listings may be sponsored. Sponsorship never changes our editor scores. Disclosure
ClickUp tries to put tasks, documents, and goals in one workspace so a team does not split those jobs across three products. The company was founded in 2017 and is based in San Diego. There is a free plan. In November 2026 the public pricing page did not expose a stable dollar figure to our check, so this profile does not list a starting price.
ClickUp is aimed at small business, mid-market, enterprise teams and runs on Web, Windows, Mac, iOS, Android. It suits teams that want many views — list, board, calendar, and docs — without buying a second tool. The breadth is the point, and it is also why new workspaces can feel busy on day one.
We did not publish a starting price for ClickUp. The pricing page either asks for a quote or did not show a stable number in our November 2026 check, so the profile says “Not listed” instead of guessing.
Ease of use is the trade for that breadth. Do not assume a dollar price from older roundups; confirm Core and Business on the vendor page. We are not stating a per-user amount here.
The editor score is an opinion across features, ease of use, pricing and value, support, and integrations. It is not a user-rating average. ClickUp has no customer reviews on this directory yet. Corrections go through the contact page.
Work breaks down several levels inside a list or folder.
Notes live next to the tasks they describe.
List, board, and calendar are part of the product story.
Targets can sit beside the tasks that feed them.
Paid plans raise automation limits; confirm the current cap.
Extra surfaces exist inside the same account.
Figures below are the vendor’s published list prices when we could confirm them. “See vendor site” means we did not publish a number.
Free
See vendor site
paid plan name on the pricing page
See vendor site
paid plan
Custom
contact sales
We do not publish interface images we have not captured ourselves. This gallery stays empty until an editor adds them.
Teams look elsewhere when ClickUp feels like too many products in one tab, when they want a calmer task list, or when engineers already standardized on a delivery tracker. A docs-first tool is the other common fork. The profiles linked below are the ones we list, scored the same way, with unpublished prices left blank.
Work management with a named owner on every task
4.6 Editor score Editor score 4.6 out of 5. This is an editorial opinion, not a user rating.
Colorful boards for tracking work across a team
4.4 Editor score Editor score 4.4 out of 5. This is an editorial opinion, not a user rating.
Work tracking for software teams and their backlogs
4.3 Editor score Editor score 4.3 out of 5. This is an editorial opinion, not a user rating.
Docs, wikis, and databases in one workspace
4.6 Editor score Editor score 4.6 out of 5. This is an editorial opinion, not a user rating.
No reviews yet — be the first.
We do not publish user reviews until a real submission system is open. Editor score above is not an average of customer ratings.