Menu
Categories Document Collaboration Online Whiteboard Project Management Task Management Team Communication Video Conferencing Compare Guides Blog Get Listed List your tool Contact
Search

Confluence

A team wiki that sits beside Jira

4.2 Editor score Editor score 4.2 out of 5. This is an editorial opinion, not a user rating.

Features · 30% 4.4
Ease of use · 20% 3.8
Pricing and value · 20% 4.2
Support · 15% 4.0
Integrations · 15% 4.6

How this score is built

Last updated November 15, 2026. Editor scores are our opinion, not user ratings. Prices were read from vendor sites in November 2026 and can change. Some listings may be sponsored. Sponsorship never changes our editor scores. Disclosure

Overview

Confluence is Atlassian’s team space for documentation: meeting notes, how-to pages, and product specs. Atlassian is based in Sydney, and Confluence dates to 2004. It is at its most useful beside Jira, where an issue can link to the page that explains the decision. A free cloud plan exists. We did not print a Standard or Premium dollar amount because this check did not lock a current per-user figure.

Confluence is aimed at mid-market, enterprise teams and runs on Web, iOS, Android. Engineering and IT teams use it as the wiki their tickets point at. Page trees, templates, and restrictions are familiar to anyone who has worked in an Atlassian site. It is a weaker home for a design critique or a freeform database.

We did not publish a starting price for Confluence. The pricing page either asks for a quote or did not show a stable number in our November 2026 check, so the profile says “Not listed” instead of guessing.

The editor is more formal than a modern docs tool, and the value drops if you do not use Jira. Confirm the free-plan user cap on Atlassian’s page rather than trusting an old blog.

The editor score is an opinion across features, ease of use, pricing and value, support, and integrations. It is not a user-rating average. Confluence has no customer reviews on this directory yet. Corrections go through the contact page.

Key features

Pages and spaces

Documentation is organized in spaces with a page tree.

Templates

Meeting notes and project posters are built in.

Jira links

Issues and pages reference each other.

Permissions

Spaces and pages can be restricted.

Comments

Inline and page comments collect review.

Cloud plans

Free, Standard, Premium, and Enterprise are the published cloud ladder.

Pricing

Figures below are the vendor’s published list prices when we could confirm them. “See vendor site” means we did not publish a number.

Free

Free

  • A free Confluence plan is published

Standard

See vendor site

per-user cloud plan

  • More space and permissions

Premium

See vendor site

per-user cloud plan

  • Admin insights and sandbox controls

Enterprise

Custom

contact sales

  • Atlassian enterprise programs

Pros and cons

Pros

  • Natural next to Jira
  • Free plan exists
  • Clear page hierarchy
  • Long track record in software teams

Cons

  • Paid prices not confirmed here
  • Stiffer editing than a lightweight doc
  • Less compelling without the rest of Atlassian

Integrations

  • Jira
  • Trello
  • Slack
  • Microsoft Teams
  • Google Drive
  • Figma
  • GitHub

Screenshots

No screenshots yet

We do not publish interface images we have not captured ourselves. This gallery stays empty until an editor adds them.

Top alternatives

Notion is the comparison when you want databases and a looser wiki. Google Docs is the comparison when you only need a document. Jira is not a substitute for the pages; it is the tracker those pages explain. The profiles linked below are the ones we list, scored the same way, with unpublished prices left blank.

See all Confluence alternatives

Reviews

No reviews yet — be the first.

We do not publish user reviews until a real submission system is open. Editor score above is not an average of customer ratings.